Spray tower wet scrubber is mainly used to treat and purify the exhaust gas containing acid mist. It works as follows: The acid mist exhaust gas is introduced into the purification tower through the air duct, passes through the filler layer, and the exhaust gas and the sodium hydroxide absorption liquid undergo gas-liquid two-phase. Full contact with the absorption and neutralization reaction. After the acid mist exhaust gas is purified, it is dewatered and defogged by a demister plate and discharged into the atmosphere by a fan. The absorption liquid is sprayed down on the top of the tower after being pressurized by a pump at the bottom of the tower, and finally returned to the bottom of the tower for recycling.
A wet air scrubber may be combined with other air adsorption tower, e.g. gases can be first cleaned by a washer, treated by a activate carbon adsorption tower after which the gas can be treated again by a wet air scrubber. However, our scrubber has an efficiency of more than 95%.
The name of gas
|
Molecular formula
|
The kind of cleaning mixture
|
Removal rate
|
Hydrochloric acid
|
HCl
|
H2O
|
90~95%
|
NaOH
|
95~99%
|
||
Hydrofluoric acid
|
HF
|
H20
|
90~95%
|
NaOH
|
95~99%
|
||
Annonia gas
|
NH3
|
H2O
|
90~95%
|
H2SO4
|
>99%
|
||
Cyanic acid
|
HCN
|
NaOH
|
90~98%
|
Sulfur dioxide
|
SO2
|
NaOH
|
>95~99%
|
Chlorine
|
Cl2
|
NaOH
|
>95~99%
|
Hydrogen sulfide
|
H2S
|
NaOH
|
95~99%
|
Sulfuric acid
|
H2SO4
|
H2O
|
>95~99%
|
Chromic acid
|
CrO3
|
H2O
|
95~99%
|
Sodium hydroxide
|
NaOH
|
H2O
|
95~99%
|
Nitric acid
|
HNO3
|
H2O
|
90~99%
|
optional parts:
water pump/centrifugal fan /activity carbon Tower/dosing tank
Application:
Chemical industries | |
Pulp and paper industries | |
Petrochemical industries | |
Steel making | |
Corn Processing Facilities, | |
Food Manufacturing, | |
Pharmaceutical industries | |
Fertilizer production and processing industries | |
Machining and Grinding exhaust, | |
Fiberglass & Composite Industries, | |
Utility Boilers, | |
Foundries and Metal Finishing Operations. |
The equipment features:
1. The equipment is applicable to continuous and intermittent exhaust waste gas treatment. | ||||
2. It can purify various of pollutants at the same time, and has good defogging performance. | ||||
3. The packing adopts high efficiency and low resistance environmental protection ball, it can thoroughly remove the odors and harmful substances in the gas. | ||||
4.Material: The whole body of the tower adopts brand-new PP board, which has the advantages of anti-corrosion, anti-aging, anti-ultraviolet and so on. Suitable for a variety of work environments. | ||||
5.Configuration: The vertical anticorrosion pump in the spray tank inside the tower body can be idled, no dry burning, no leakage and easy to maintain. The auxiliary water tank is controlled by floating ball, automatic water feeding and no manual maintenance |
Wet scrubber standardized production parameter list
Air volume |
Washing tower size mm | height | thickness | Import and export size | Pump power | weight/kg | Wind resistance/pa |
3000 | 800 | 4200 | 8 | 315 | 0.75KW | 144 | 500 |
5000 | 1000 | 4200 | 8 | 400 | 1.1KW | 240 | 500 |
8000 |
1200 | 4200 | 8 | 500 | 1.5KW | 360 | 500 |
10000 | 1500 | 4700 | 8 | 600 | 2.2KW | 600 | 500 |
15000 | 1800 | 5100 | 10 | 650 | 3KW | 840 | 500 |
20000 | 2000 | 5100 | 10 | 700 | 4KW | 1080 | 500 |
25000 | 2200 | 5200 | 10 | 750 | 5.5KW | 1320 | 600 |
30000 | 2500 | 5200 | 12 | 800 | 5.5KW | 1800 | 600 |
35000 | 2800 | 5500 | 12 | 900 | 7.5KW | 2040 | 600 |
40000 | 3000 | 5500 | 12 | 1000 | 7.5KW | 2640 | 600 |
FAQ:
1. Q. Are you a trading company or manufacture?
A: We are manufacture; we have our professional manufacturing teams and technicians
2. Q. How long is the warranty of your equipment?
A: One year warranty, in the meanwhile, quality inspection before delivery; during the warranty period, we
can replace the damaged consumables for free, after the warranty period, we have a good price for
consumables for our customers.
3. Q: Do you have technical support?
A: Our Company is responsible for installation and debugging of equipment, meanwhile, responsible for the
technology and operation training for user operator.
4. Q: Is overseas after-sales service available?
A: Yes, and after installation we will teach you basic operation and maintenance method.
5. Q: May I customize my own equipment?
A: Yes, please inform us your needs in details and we will design the facility per your data.